Drop Down Menu

 

Installation / Connection of ice cream machines

Air cooled ice cream machine

The machine is connected solely to 230V 10A outlet.
NOTE! Free airflow around the machine.

Water cooled ice cream machine

The machine is connected to the cold water pipe with the minimum pressure of 3bar.
Europe CEE plug 3 phase 400V16A.
Different options for sewer is available.


We do service on

Soft ice cream machines:

- Carpigiani
- Coldelite
- Electro Freeze
- Frigomat
- Luna
- Nissei
- OTT
- Stoelting
- Taylor

Batch freezer:

- Cattabriga
- Coldelite
- Musso
- OTT
- Promag
- Staff

Other:

- Bedum
- Silex


Accessories & equipment

Great to have when starting the ice cream machine:


Ice cream mix in 2L, 5L & 10L boxes

Wafer cup for ice cream


Cup for ice cream

Ice cream spoons


Topping 2-3 varieties. For example, cola, licorice & noisette

3 different sprinkles

Spatula for ice cream/gelato

Straws & drink cups for milkshake

Napkins

Promotional materials, flags etc.

Antibacterial detergent

Milkcleaner

Sanitizer

Lubricant Petrol-Gel

Scissors + knife for opening packages/boxesr

User guide
   

Tips & advice

How do I prepare my ice cream machine for the winter?

With air-cooled machines start with washing machine and clean all parts thoroughly, let the machine and parts to dry overnight before reassembling. Grease sparingly and re-assembled on site. Pull only the front bolts easily, auger shaft can be deformed if it is too tensioned all winter. Unplug the machine. Close the lid and cabinet doors. You might place a small paper in between for air ventilation.

In water-cooled machines, start by turning off the water supply and disconnect the input and outlet hoses. The machine shall be properly washed and all parts thoroughly cleaned. Start the machine up to operating mode without the parts fitted (machines that boot protection front plate must have this installed in order to run). Run in two to three minutes when the water begins to drip out of the hose connections, you can easily with blow out the cooling water system. Blow until it comes out more water (about 2-5 cups water). Let the machine and the parts dry overnight before reassembling. Grease sparingly and re-assembled on site. Pull only the front bolts easily, auger shaft can be deformed if it is too tensioned all winter. Unplug the machine. Close the lid and cabinet doors. You might place a small paper in between for air ventilation.


   

Copyright 2013 ALRp AGENTUR AB.
Address: Norra Grängesbergsgatan 5, 214 44 MALMOE. SWEDEN. Phonenumber: 0046-40321730. E-mail: infoalrp.se